Project: mhlRV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Mark Larsen   -  
Project:   Vans - RV-14A
Total Hours:1661.5
Total Flight Time:
Start/Last Date:Sep 21, 2020 - No Finish Date
Engine:Lycoming YIO-390-EXP119 (YENPL-RT2E11172)
 
Friendly URL: https://eaabuilderslog.org?s=mhlRV14A

Home or Last Project Picture

Jan 16, 2021     08-07 - Horizontal Stabilizer Skeleton Drilling and Dimpling - (3.4 hours)       Category: 8 Horiz Stab
1/16/2021 – 3.4 hours
The horizontal stabilizer front spar came off the shelf to match drill a couple of holes into the modified nose rib aft flanges and a hole in the modified in-spar ribs forward flange. I had not worked with the HS spars in awhile, so I was glad that I had marked the top flange and direction. That made orienting the spar to the ribs quick and reduced the chance of inadvertently doing things upside down! I wrapped up this section by dimpling most of the #40 holes in the nose and in-spar ribs.
[#30 Drill, Pneumatic Squeezer, Reduced Diameter 3/32 Dimple Dies]


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.